Skip to content
  • Main
  • Expertise
  • About
  • Projects
  • Main
  • Expertise
  • About
  • Projects
AR
Start a project ↗

Project Sector: Water Transmission

Implementation of the operational underground tank in Rabwah – Khulais Governorate

Operational Tanks + Water Transmission Lines – Site Works (GEO) · Western Cluster · 2,450 m3 capacity

Implementation of the operational underground tank in the King Fahd area – Khulais Governorate

Operational Tanks + Water Transmission Lines – Site Works (GEO) · Western Cluster · 5,000 m3 capacity

Implementation of water distribution lines from the proposed operational reservoir in Bahra City to the southeastern city gate reservoir in Jeddah City

Water Transmission Line – Site Works (Survey+GEO) · Western Cluster · 65,384 m2 site / survey area

Implementation of water distribution lines in Bahra City – Bahra Governorate

Water Transmission Line – Site Works (Survey+GEO) · Western Cluster · 34.62 km survey / line length

Implementation of the main distribution lines in Al-Kamil City, Al-Kamil Governorate

Water Transmission Line – Site Works (Survey+GEO) · Western Cluster · 28.97 km survey / line length

Implementation of the main water distribution station for Al Sharif Reservoir (first phase)

Transmission line – Design · Western Cluster · 15.40 km designed length

Construction of Pipelines of Diameters of 300mm and Above on Asfan Road and within Miscellaneous districts east of Al Harameen Expressway and north east of KAIA

Water Transmission Line – Design + Site Works (Survey + Geotechnical) · Western Cluster · 46.15 km designed length

Construction of Water Transmission main from new Faisalyah PS to Faisalyah South loop

Water Transmission Line – Design + Site Works (Survey+GEO) · Western Cluster · 2.86 km designed length

Construction of water distribution networks of Al-Waset,Rayihana and Rehab districts

Water distribution networks + Transmission line – Design · Western Cluster · 92.50 km designed length

Construction of Water Transmission lines Extensions from P1 to Faisalyah North Zone

Water Transmission Line – Design + Site Works (Survey+GEO) · Western Cluster · 7.27 km designed length

← Previous
Next →
Engineering the Future with Precision.
ECONST / Saudi Arabia

Designing futures.

Valuing the present.

Navigate
About
Expertise
Projects
Impact
Connect
Start a project ↗
econst-sa.com ↗
Location
Riyadh
Kingdom of Saudi Arabia
© 2026 ECONST
Design and Development by Hadou Design
Back to top ↑