Skip to content
  • Main
  • Expertise
  • About
  • Projects
  • Main
  • Expertise
  • About
  • Projects
AR
Start a project ↗

Project Sector: Water Transmission

Construction of Water Transmission Main Interconnections from P1, GRC1 (Part 1)

Water Transmission Line – Design + Site Works (Survey+GEO) · Western Cluster · 7.70 km designed length

Design and Construction of Water Transmission Line from CP2 Line to P1 Line to serve Areas West of Airport

Water Transmission Line – Design + Site Works (Survey+GEO) · Western Cluster · 18.3 km designed length

← Previous
Engineering the Future with Precision.
ECONST / Saudi Arabia

Designing futures.

Valuing the present.

Navigate
About
Expertise
Projects
Impact
Connect
Start a project ↗
econst-sa.com ↗
Location
Riyadh
Kingdom of Saudi Arabia
© 2026 ECONST
Design and Development by Hadou Design
Back to top ↑