Construction of Water Transmission Main Interconnections from P1, GRC1 (Part 1)

Water Transmission Line – Design + Site Works (Survey+GEO) · Western Cluster · 7.70 km designed length
Design and Construction of Water Transmission Line from CP2 Line to P1 Line to serve Areas West of Airport

Water Transmission Line – Design + Site Works (Survey+GEO) · Western Cluster · 18.3 km designed length