ECONST engineering expertise
Expertise / Integrated Engineering Consultancy

Expertise in
every layer.

From studies, planning and design to project management, commercial control, supervision, quality and digital engineering — ECONST brings the disciplines together around one precise delivery process.

04Core departments
09Engineering disciplines
01Integrated process
02 Engineering & design

Designing systems
that work together.

Engineering and urban systems
Innovative solutions / Quality assured / Sustainable future / Safety first / On-time delivery
4.1

Urban

4.2

Landscape

4.3

Transportation

Road / Traffic / Airport

4.5

Structure

4.4

Utilities

Wet Utilities
Water / Sewage / Irrigation / Hydrology
Dry Utilities
Electrical / Control / Telecom
Mechanical
Utilities / MEP
4.6

Architecture

4.7

BIM & GIS

4.8

Solid Waste

4.9

Environmental

03 Commercial department

Protecting value.
Controlling certainty.

1.1 / CONTRACTS

Securing project integrity.

Commercial management built around clear frameworks, balanced risk and disciplined contract administration.

  • Contract Drafting & Review 01
  • Risk Allocation 02
  • Claims & Dispute Management 03
1.2 / QS & SPECIFICATIONS

The backbone of construction.

Technical standards and quantities translated into clear, buildable and procurement-ready information.

  • Define Specifications 01
  • Precise Quantification 02
  • Procurement Readiness 03
1.3 / COST

Driving financial efficiency.

Cost intelligence supporting resilient budgets and informed project decisions.

  • Cost Estimation 01
  • Value Engineering 02
  • Market Analysis 03
Mitigate RiskStructured commercial control.
Ensure PrecisionRigorous technical and quantity standards.
Optimize ValueFinancial efficiency from estimate to closeout.
Deliver TrustClear, long-term client relationships.
04 Project management office

Control the process.
Protect the outcome.

Engineering project planning and coordination
PMO / Integrated project controls

Every decision connected.

01

Time

02

Cost

03

Risk

04

Control

05

Teamwork

06

Communication

07

Analysis

08

Planning

04.1 Project supervision

From design intent to delivery.

ECONST’s consultancy scope includes supervising projects alongside study, design, planning, project management and engineering services — keeping technical intent connected to execution.

SupervisionEngineering CoordinationProject ManagementDelivery Follow-up
Quality and safety engineering
05 Quality & safety

Engineering excellence.
Without compromise.

01

Quality Control

02

Safety Commitment

03

People First

04

Continuous Improvement

BIM digital engineering model
06 Digital engineering

Precision powered
by digital intelligence.

BIM

Model-led coordination

GIS

Spatial intelligence

DATA

Connected decisions

PROCESS

Forward-thinking delivery

07 Studies & advisory

Better decisions start with better engineering insight.

ECONST applies a scientific basis to studying, designing and planning, supported by engineering consultation and project management services.

Engineering StudiesPlanningTechnical AdvisoryDesign Support
08 Our impact

Capability measured
in real infrastructure.

76

Documented projects in the current portfolio

4

Regional project clusters

6

Infrastructure sectors represented

Global

Partnership-driven engineering capability

ECONST project reach and Saudi impact
Portfolio composition

Water infrastructure at scale.

Water Transmission32 projects
Water Networks22 projects
Tanks & Reservoirs18 projects
Wastewater & Sewage9 projects
Pumping Stations7 projects
Structural & Retaining Works1 project

Projects can span more than one sector, reflecting ECONST’s integrated scope across networks, transmission, storage, pumping and supporting structures.

Explore all projects →

09 / Start a project

Bring every discipline
to one table.

Start your project →