Implementation of the main distribution lines, including pumping works up to the demonstration tank – Al Qunfodhah Governorate

Water Transmission Line – Site Works (Survey+GEO) · Western Cluster · 50 km survey / line length
Implementation of main water distribution lines in the city of Mastura – Rabigh Governorate

Water Transmission Line – Site Works (Survey+GEO) · Western Cluster · 1.20 km survey / line length
Implementing the expansion of the water distribution system (the city’s gateway tank and the upper tamks, the main distribution lines) package 1

Water Transmission Line – Design + Site Works (Survey+GEO) · Western Cluster · 47.7 km designed length
Implementation of main water distribution lines in Al-Qadimiah City – Rabigh Governorate

Water Transmission Line – Site Works (Survey+GEO) · Western Cluster · 2.10 km survey / line length
Implementation of main distribution lines, including pumping works for the connection works in Aziziyah

Transmission Lines · Western Cluster
Implementation of main distribution lines, including pumping works from the Gran Pumping Station – Khulais City

Transmission Lines · Western Cluster
Implementation of distribution lines in the southern regions of Al-Daf, Al-Salam and Fazaa – Khulais City

Operational Tanks + Water Transmission Lines – Site Works (GEO) · Western Cluster
Implementation of distribution lines in the Gran area – Khulais City

Operational Tanks + Water Transmission Lines – Site Works (GEO) · Western Cluster
Implementation of distribution lines in the northern areas of Al-Daf, Al-Salam and Fazaa – Khulais City

Operational Tanks + Water Transmission Lines – Site Works (GEO) · Western Cluster
Implementation of the underground city gate tank in Khulais/Northeast Jeddah – Khulais Governorate

Operational Tanks + Water Transmission Lines – Site Works (GEO) · Western Cluster · 10,900 m3 capacity