Single project / Water Transmission / Western Cluster
Implementation of main water distribution lines in the city of Mastura – Rabigh Governorate
Project detail
Overview
Project
overview.
Total amount of Survey works: Transmission Line Works are 1.20 km.
Number Of BH: 1 BHS With 10 meters of Total depth
Transmission Line Works are 1.20 km.
1 BHS
With 10 meters of Total depth
↗
Survey / line length1.20 km⌁
Survey / line length1.2 km⌖
LocationRabigh, Saudi Arabia#
Project numberAP481Project details
Scope and technical highlights
- Total amount of Survey works: Transmission Line Works are 1.20 km.
- Number Of BH: 1 BHS With 10 meters of Total depth
- Transmission Line Works are 1.20 km.
- 1 BHS
- With 10 meters of Total depth
Scope of work
Transmission LineWater Transmission Line – Site Works (Survey+GEO)
Water Transmission Line – Site Works (Survey+GEO)
Key quantities
1.20 km
Survey / line length
1.2 km
Survey / line length
Project gallery
Project imagery.
1 image