Single project / Water Transmission / Western Cluster
Implementation of main water distribution lines in Al-Qadimiah City – Rabigh Governorate
Project detail
Overview
Project
overview.
OUT OF SCOPE (Site works only)
Total amount of Survey works: Transmission Line Works are 2.10 km.
Number Of BH: 2 BHS With 20 meters of Total depth
Transmission Line Works are 2.10 km.
2 BHS
With 20 meters of Total depth
↗
Survey / line length2.10 km⌁
Survey / line length2.1 km⌖
LocationRabigh, Saudi Arabia#
Project numberAP480Project details
Scope and technical highlights
- OUT OF SCOPE (Site works only)
- Total amount of Survey works: Transmission Line Works are 2.10 km.
- Number Of BH: 2 BHS With 20 meters of Total depth
- Transmission Line Works are 2.10 km.
- 2 BHS
- With 20 meters of Total depth
Scope of work
Transmission LineWater Transmission Line – Site Works (Survey+GEO)
Water Transmission Line – Site Works (Survey+GEO)
Key quantities
2.10 km
Survey / line length
2.1 km
Survey / line length