The contract of supplying water to the airport areas from 1 to 5

Transmission line – Design · Central Cluster · 33.26 km designed length
Construction of 2 operational water tanks with a capacity of 100,000 m3 at the locations of AL-WAZIYAH an AL-GHWAIBAH

Water System – Design + Site Works (Survey + Geotechnical) · Eastern Cluster · 26.5 km designed length
Construction of Pipelines of Diameters of 400mm and Above within Miscellaneous districts located South and South East Al Faisalyah Complex

Water Transmission Line – Design + Site Works (Survey+GEO) · Western Cluster · 36.6 km designed length
Implementing pipelines with a diameter of 300mm and above for the northern regions of Obhur Bay.F1015

Water Transmission Line – Design + Site Works (Survey+GEO) · Western Cluster · 33 km designed length
Construction of Pipelines of Diameters of 400mm and Above within Miscellaneous districts located South and South East Al Faisalyah Complex

Water Transmission Line – Design + Site Works (Survey+GEO) · Western Cluster · 38.5 km designed length
Implementation of main distribution lines in the city of Ranyah

Water Transmission Line – Site Works (Survey+GEO) · Western Cluster · 24.29 km survey / line length
Implementation of the distribution network in the old area of the city of Ranyah

Water Transmission Line – Site Works (Survey+GEO) · Western Cluster · 439.59 ha survey / network area
Implementation of the main distribution lines, including pumping works from the city gate reservoir in Khulais – Khulais City

Operational Tanks + Water Transmission Lines – Site Works (GEO) · Western Cluster
Implementation of the main distribution network in Hali City – Al Qunfodhah Governorate

Water Transmission Line – Site Works (Survey+GEO) · Western Cluster · 73.59 km survey / line length
Implementation of main distribution lines in the areas from Al-Rafdah to (Al-Muzaylif) – Al-Qunfodhah Governorate

Water Transmission Line – Site Works (Survey+GEO) · Western Cluster · 7 km survey / line length