Single project / Water Transmission / Western Cluster
Implementation of the distribution network in the old area of the city of Ranyah
Project detail
Overview
Project
overview.
Total amount of Survey works: Transmission Line Works are 432.3 km.
Number Of BH: 11 BHS With 55 meters of Total depth
Network works are 439.59 hectares.
10 BHS
With 50 meters of Total depth
↗
Survey / network area439.59 ha⌁
Survey / line length432.3 km⌖
LocationRanyah, Saudi Arabia#
Project numberP1135-3Project details
Scope and technical highlights
- Total amount of Survey works: Transmission Line Works are 432.3 km.
- Number Of BH: 11 BHS With 55 meters of Total depth
- Network works are 439.59 hectares.
- 10 BHS
- With 50 meters of Total depth
Scope of work
Water distribution networkWater Transmission Line – Site Works (Survey+GEO)
Water Transmission Line – Site Works (Survey+GEO)
Key quantities
439.59 ha
Survey / network area
432.3 km
Survey / line length
Project gallery
Project imagery.