
Single project / Water Transmission / Western Cluster
Implementation of the main distribution lines in Al-Kamil City, Al-Kamil Governorate
Project detail
Overview
Project
overview.
OUT OF SCOPE (Site works only)
Total amount of Survey works: Transmission Line Works are 18.40 km.
Number Of BH: 4 BHS With 40 meters of Total depth
Transmission Line Works are 28.97 km.
4 BHS
With 40 meters of Total depth
↗
Survey / line length28.97 km⌁
Survey / line length18.4 km⌖
LocationAl-Kamil, Saudi Arabia#
Project numberAP449Project details
Scope and technical highlights
- OUT OF SCOPE (Site works only)
- Total amount of Survey works: Transmission Line Works are 18.40 km.
- Number Of BH: 4 BHS With 40 meters of Total depth
- Transmission Line Works are 28.97 km.
- 4 BHS
- With 40 meters of Total depth
Scope of work
Transmission LineWater Transmission Line – Site Works (Survey+GEO)
Water Transmission Line – Site Works (Survey+GEO)
Key quantities
28.97 km
Survey / line length
18.4 km
Survey / line length


