Single project / Water Transmission / Western Cluster
Implementation of water distribution lines in Bahra City – Bahra Governorate
Project detail
Overview
Project
overview.
Total amount of Survey works: Transmission Line Works are 26.50 km.
Number Of BH: 17 BHS With 170 meters of Total depth
Transmission Line Works are 34.62 km.
10 BHS
With 100 meters of Total depth
↗
Survey / line length34.62 km⌁
Survey / line length26.5 km⌖
LocationBahra, Saudi Arabia#
Project numberAP457Project details
Scope and technical highlights
- Total amount of Survey works: Transmission Line Works are 26.50 km.
- Number Of BH: 17 BHS With 170 meters of Total depth
- Transmission Line Works are 34.62 km.
- 10 BHS
- With 100 meters of Total depth
Scope of work
Transmission LineWater Transmission Line – Site Works (Survey+GEO)
Water Transmission Line – Site Works (Survey+GEO)
Key quantities
34.62 km
Survey / line length
26.5 km
Survey / line length