
Single project / Pumping Stations / Water Networks / Eastern Cluster
Replacing water networks in Hofuf, Mubarraz and Al-Ahsa villages (first phase)
Project detail
Overview
Project
overview.
OUT OF SCOPE (Site works only)
Total amount of Survey works: The total area of the network works is 835 hectares. The total length of the Force mains is 54 km. The total area of the Pumping station works is 84,000 square meters.
Number Of BH: 62 BHS With 620 meters of Total depth
↗
Survey area768.10 (Hec) + 84000 (m2)⌁
Survey / line length47.1 km⌖
LocationAl-Ahsa, Eastern Province, Saudi Arabia#
Project numberP405Project details
Scope and technical highlights
- OUT OF SCOPE (Site works only)
- Total amount of Survey works: The total area of the network works is 835 hectares. The total length of the Force mains is 54 km. The total area of the Pumping station works is 84,000 square meters.
- Number Of BH: 62 BHS With 620 meters of Total depth
Scope of work
SiteSite Works – ( Survey + Geotechnical )
Site Works – ( Survey + Geotechnical )
Key quantities
768.10 (Hec) + 84000 (m2)
Survey area
47.1 km
Survey / line length


