Development works project for existing pumping stations and discharge lines in Al-Ahsa Governorate
Single project / Pumping Stations / Eastern Cluster

Development works project for existing pumping stations and discharge lines in Al-Ahsa Governorate

Project numberP387
ClusterEastern Cluster
Program / Work orderWork Order No.5
OwnerNWC
Main consultantKUNHWA
ClassificationSite Works – ( Survey + Geotechnical )
Project detail
Overview

Project
overview.

OUT OF SCOPE (Site works only)

Total amount of Survey works: The total length of the Force mains are 69.4 km. The total area of the two Pumping stations works are 3,494 square meters.

Number Of BH: 41 BHS With 415 meters of Total depth

Survey area2000 (m2) + 1494 (m2)
Survey / line length64.6 km
LocationAl-Ahsa, Eastern Province, Saudi Arabia
#
Project numberP387
Project details

Scope and technical highlights

  • OUT OF SCOPE (Site works only)
  • Total amount of Survey works: The total length of the Force mains are 69.4 km. The total area of the two Pumping stations works are 3,494 square meters.
  • Number Of BH: 41 BHS With 415 meters of Total depth
Scope of work
SiteSite Works – ( Survey + Geotechnical )
Site Works – ( Survey + Geotechnical )
Key quantities
2000 (m2) + 1494 (m2)
Survey area
64.6 km
Survey / line length