Implementation of the water distribution network in Al-Qadimiah city – Rabigh Governorate
Project detail
Overview
Project
overview.
Total amount of Survey works: Network works are 229.6 hectares.
Number Of BH: 4 BHS With 40 meters of Total depth
Network works are 229.6 hectares.
4 BHS
With 40 meters of Total depth
↗
Survey / network area229.6 ha⌁
Survey area229.6 (Hec)⌖
LocationRabigh, Saudi Arabia#
Project numberP1124Project details
Scope and technical highlights
- Total amount of Survey works: Network works are 229.6 hectares.
- Number Of BH: 4 BHS With 40 meters of Total depth
- Network works are 229.6 hectares.
- 4 BHS
- With 40 meters of Total depth
Scope of work
Water distribution networkWater Network – Site Works (Survey+GEO)
Water Network – Site Works (Survey+GEO)
Key quantities
229.6 ha
Survey / network area
229.6 (Hec)
Survey area