Construction of Water Distribution Networks at Parts of Al Sheraa, Al Amwaj and Obhur Al Shamalyyah Districts
Single project / Water Networks / Western Cluster

Construction of Water Distribution Networks at Parts of Al Sheraa, Al Amwaj and Obhur Al Shamalyyah Districts

Project numberAP862
ClusterWestern Cluster
Program / Work order1
OwnerNWC
Main consultantKUNHWA
ClassificationWater Network – Design + Site Works (Survey+GEO)
Project detail
Overview

Project
overview.

DIA FROM 110 mm to 300 mm , Total lengthes = 92.7 km

Proposed Water Networks: The proposed water network diameters range from 110 mm to 300 mm. With a total length of 92.70 km.

Connection points on existing water networks: The proposed networks are connected to the existing and surrounding water networks to the area. The connection points are 2 points.

Total amount of Survey works: Network works are 468 hectares.

Number Of BH: 8 BHS With 92.50 meters of Total depth

Network works are 471.57 hectares.

Designed length92.7 km
Survey / network area471.57 ha
LocationJeddah, Saudi Arabia
#
Project numberAP862
Project details

Scope and technical highlights

  • DIA FROM 110 mm to 300 mm , Total lengthes = 92.7 km
  • Proposed Water Networks: The proposed water network diameters range from 110 mm to 300 mm. With a total length of 92.70 km.
  • Connection points on existing water networks: The proposed networks are connected to the existing and surrounding water networks to the area. The connection points are 2 points.
  • Total amount of Survey works: Network works are 468 hectares.
  • Number Of BH: 8 BHS With 92.50 meters of Total depth
  • Network works are 471.57 hectares.
  • 8 BHS
View full technical data +
  • With 92.50 meters of Total depth
Scope of work
Water distribution networkWater Network – Design + Site Works (Survey+GEO)
Water Network – Design + Site Works (Survey+GEO)
Key quantities
92.7 km
Designed length
471.57 ha
Survey / network area