Faifa water and sewage projects – retaining walls

Retaining Structures / Geotechnical & Structural Design · Southern Cluster
Replacing water networks in Hofuf, Mubarraz and Al-Ahsa villages (first phase)

Site Works – ( Survey + Geotechnical ) · Eastern Cluster · 768.10 (Hec) + 84000 (m2) survey area
Development works project for existing pumping stations and discharge lines in Al-Ahsa Governorate

Site Works – ( Survey + Geotechnical ) · Eastern Cluster · 2000 (m2) + 1494 (m2) survey area
Construction of 2 operational water tanks with a capacity of 100,000 m3 at the locations of AL-WAZIYAH an AL-GHWAIBAH

Water System – Design + Site Works (Survey + Geotechnical) · Eastern Cluster · 26.5 km designed length
Implementation of Al-Ma’isem Pumping Station to Serve Mina areas 8 & 9

Water Pumping Station – Design · Western Cluster · 512,000 m3/day design capacity
Implementation of A Conveyor, Pumping Station And Tank To Serve The AL-AKHBAB Supply Area (AL WESSAM)

Water Pumping Station · Western Cluster · 36,500 m3/day design capacity
Design and implementation of the expulsion line, lifting station and its accessories to serve the Rabigh (North) areas

Sewage P.S + Force Main – Site Works (Survey+GEO) · Western Cluster · 23.90 km survey / line length