
Single project / Pumping Stations / Structural & Retaining Works / Southern Cluster
Faifa water and sewage projects – retaining walls
Project detail
Overview
Project
overview.
P665-1: 63 sewage pumping stations.
P726: 34 water pumping stations.
8 proposal modules for retaining structures.
Scope: preparing reservation report.
Scope: soil stability and retaining structures recommendations report.
Scope: full geotechnical report including soil stability and retaining works measures.
⌖
LocationFaifa, Saudi Arabia#
Project numberP665-1&P726◇
ConsultantIDOMProject details
Scope and technical highlights
- P665-1: 63 sewage pumping stations.
- P726: 34 water pumping stations.
- 8 proposal modules for retaining structures.
- Scope: preparing reservation report.
- Scope: soil stability and retaining structures recommendations report.
- Scope: full geotechnical report including soil stability and retaining works measures.
- Scope: structural design of soil stability and retaining structures.
Scope of work
Geotechnical EngineeringStructural DesignRetaining Structures
Retaining Structures / Geotechnical & Structural Design
Project gallery
Project imagery.
1 image



