Implementing water distribution network in Al Kawthar District
Single project / Water Networks / Western Cluster

Implementing water distribution network in Al Kawthar District

Project numberAP657
ClusterWestern Cluster
Program / Work order1
OwnerNWC
Main consultantKUNHWA
ClassificationWater Network – Design + Site Works (Survey+GEO)
Project detail
Overview

Project
overview.

DIA FROM 110 mm to 400 mm , Total lengthes = 53 km

Proposed Water Networks: The proposed water network diameters range from 110 mm to 400 mm. With a total length of 53 km.

Connection points on existing water networks: The proposed networks are connected to the existing and surrounding water networks to the area. The connection points are 2 points.

Future connection points: The proposed networks have 1 future points to feed the surrounding areas.

Total amount of Survey works: Network works are 406.27 hectares.

Number Of BH: 7 BHS With 79 meters of Total depth

Designed length53 km
Survey / network area401.45 ha
LocationJeddah, Saudi Arabia
#
Project numberAP657
Project details

Scope and technical highlights

  • DIA FROM 110 mm to 400 mm , Total lengthes = 53 km
  • Proposed Water Networks: The proposed water network diameters range from 110 mm to 400 mm. With a total length of 53 km.
  • Connection points on existing water networks: The proposed networks are connected to the existing and surrounding water networks to the area. The connection points are 2 points.
  • Future connection points: The proposed networks have 1 future points to feed the surrounding areas.
  • Total amount of Survey works: Network works are 406.27 hectares.
  • Number Of BH: 7 BHS With 79 meters of Total depth
  • Network works are 401.45 hectares.
View full technical data +
  • 7 BHS
Scope of work
Water distribution networkWater Network – Design + Site Works (Survey+GEO)
Water Network – Design + Site Works (Survey+GEO)
Key quantities
53 km
Designed length
401.45 ha
Survey / network area