Single project / Water Networks / Western Cluster
Implementation of the water distribution network in the northwest region-1 of Rabigh city (second phase)
Project detail
Overview
Project
overview.
Package AP471,AP472,AP473,AP474,AP475,AP476,AP477, AP478 - Proposed Water Distribution Networks: The Proposed water network diameters range from 110 mm to 500 mm. With a total length of 349.53 km.
Package AP471,AP472,AP473,AP474,AP475,AP476,AP477, AP478 - Total amount of Survey works: Network works are 4616.24 hectares.
Package AP471,AP472,AP473,AP474,AP475,AP476,AP477, AP478 - Number Of BH: 58 BHS With 170 meters of Total depth
↗
Survey area5.50 (Hec)⌁
Boreholes1 BH⌖
LocationRabigh, Saudi Arabia#
Project numberAP475Project details
Scope and technical highlights
- Package AP471,AP472,AP473,AP474,AP475,AP476,AP477, AP478 - Proposed Water Distribution Networks: The Proposed water network diameters range from 110 mm to 500 mm. With a total length of 349.53 km.
- Package AP471,AP472,AP473,AP474,AP475,AP476,AP477, AP478 - Total amount of Survey works: Network works are 4616.24 hectares.
- Package AP471,AP472,AP473,AP474,AP475,AP476,AP477, AP478 - Number Of BH: 58 BHS With 170 meters of Total depth
Scope of work
Water distribution networkWater Networks – Design + Site Works (Survey+GEO)
Water Networks – Design + Site Works (Survey+GEO)
Key quantities
5.50 (Hec)
Survey area
1 BH
Boreholes