Implementation of the water distribution network in Al-Shulayb and the eastern part of Rabigh city (first phase)
Single project / Water Networks / Western Cluster

Implementation of the water distribution network in Al-Shulayb and the eastern part of Rabigh city (first phase)

Project numberAP471
ClusterWestern Cluster
Program / Work orderGroup No. 4 - Rabigh
OwnerNWC
Main consultantKUNHWA
ClassificationWater Networks – Design + Site Works (Survey+GEO)
Project detail
Overview

Project
overview.

Package AP471,AP472,AP473,AP474,AP475,AP476,AP477, AP478 - Proposed Water Distribution Networks: The Proposed water network diameters range from 110 mm to 500 mm. With a total length of 349.53 km.

Package AP471,AP472,AP473,AP474,AP475,AP476,AP477, AP478 - Total amount of Survey works: Network works are 4616.24 hectares.

Package AP471,AP472,AP473,AP474,AP475,AP476,AP477, AP478 - Number Of BH: 58 BHS With 170 meters of Total depth

Survey area1221.10 (Hec)
Boreholes16 BH
LocationRabigh, Saudi Arabia
#
Project numberAP471
Project details

Scope and technical highlights

  • Package AP471,AP472,AP473,AP474,AP475,AP476,AP477, AP478 - Proposed Water Distribution Networks: The Proposed water network diameters range from 110 mm to 500 mm. With a total length of 349.53 km.
  • Package AP471,AP472,AP473,AP474,AP475,AP476,AP477, AP478 - Total amount of Survey works: Network works are 4616.24 hectares.
  • Package AP471,AP472,AP473,AP474,AP475,AP476,AP477, AP478 - Number Of BH: 58 BHS With 170 meters of Total depth
Scope of work
Water distribution networkWater Networks – Design + Site Works (Survey+GEO)
Water Networks – Design + Site Works (Survey+GEO)
Key quantities
1221.10 (Hec)
Survey area
16 BH
Boreholes