
Single project / Water Networks / Western Cluster
Implementation of water distribution networks fed from the existing ground tank in Al-Kamil-1 City
Project detail
Overview
Project
overview.
Total amount of Survey works: Network works are 872.68 hectares.
Number Of BH: 11 BHS With 110 meters of Total depth
Network works are 553.65 hectares.
11 BHS
With 110 meters of Total depth
↗
Survey / network area553.65 ha⌁
Survey area872.68 (Hec)⌖
LocationAl-Kamil, Saudi Arabia#
Project numberAP1129Project details
Scope and technical highlights
- Total amount of Survey works: Network works are 872.68 hectares.
- Number Of BH: 11 BHS With 110 meters of Total depth
- Network works are 553.65 hectares.
- 11 BHS
- With 110 meters of Total depth
Scope of work
Water distribution networkWater Networks – Site Works (Survey+GEO)
Water Networks – Site Works (Survey+GEO)
Key quantities
553.65 ha
Survey / network area
872.68 (Hec)
Survey area
Project gallery
Project imagery.
1 image



