Single project / Wastewater & Sewage / Eastern Cluster
Sewage Networks and Pumping Stations Project for the Hajr of Al-Ahsa and Buqayq Governorates (New Ain Dar – Al-Doghaima in Buqayq Governorate)
Project detail
Overview
Project
overview.
DIA FROM 200 mm to 600 mm , Total lengthes = 128 km
New Ain Dar P.S: It is implemented in two phases, the first phase has a capacity of 7,000 m3/day and the second phase has a capacity of 14,000 m3/day.
Ain Nakhal P.S: It is implemented in one phase with a total capacity of 7,000 m3/day.
Sewage Networks: Diameters range from 200 mm to 600 mm. Total length: 116 km. Total number of manholes: 1256 manholes.
New Ain Dar Force Main: Diameter 400 mm. Total length 6.1 km.
Ain Nakhal Force Main: Diameter 300 mm. Total length 6.4 km.
↗
Designed length128 km⌁
Capacity7,000 m3⌖
LocationAl-Ahsa, Eastern Province, Saudi Arabia#
Project numberP365-1Project details
Scope and technical highlights
- DIA FROM 200 mm to 600 mm , Total lengthes = 128 km
- New Ain Dar P.S: It is implemented in two phases, the first phase has a capacity of 7,000 m3/day and the second phase has a capacity of 14,000 m3/day.
- Ain Nakhal P.S: It is implemented in one phase with a total capacity of 7,000 m3/day.
- Sewage Networks: Diameters range from 200 mm to 600 mm. Total length: 116 km. Total number of manholes: 1256 manholes.
- New Ain Dar Force Main: Diameter 400 mm. Total length 6.1 km.
- Ain Nakhal Force Main: Diameter 300 mm. Total length 6.4 km.
Scope of work
Sewage Networks & Pumping StationsSewage Network – Design
Sewage Network – Design
Key quantities
128 km
Designed length
7,000 m3
Capacity