Replacement of sewage network for the cities of HOFUF and MUBARRAZ (First Phase)
Single project / Wastewater & Sewage / Eastern Cluster

Replacement of sewage network for the cities of HOFUF and MUBARRAZ (First Phase)

Project numberP361
ClusterEastern Cluster
Program / Work orderWork Order No.4
OwnerNWC
Main consultantKUNHWA
ClassificationSewage Network – Design + Site Works (Survey+GEO)
Project detail
Overview

Project
overview.

DIA FROM 200 mm to 1600 mm , Total lengthes = 257.7 km

Proposed Sewage Network: The proposed sewerage networks are connected to existing networks. Diameters range from 200 mm to 1,600 mm. Total length of 255.5 km. Total number of manholes is 6,623.

Proposed Force Mains: 400 mm diameter, total length 1 km. 500 mm diameter, total length 6.5 km. 700 mm diameter, total length 4.4 km.

Total amount of Survey works: Network works are 1,237 hectares. The transmission lines works are 10.77 km.

Number Of BH: 57 BHS With 570 meters of Total depth

Designed length257.7 km
Survey / network area1,237 ha
LocationAl-Ahsa, Eastern Province, Saudi Arabia
#
Project numberP361
Project details

Scope and technical highlights

  • DIA FROM 200 mm to 1600 mm , Total lengthes = 257.7 km
  • Proposed Sewage Network: The proposed sewerage networks are connected to existing networks. Diameters range from 200 mm to 1,600 mm. Total length of 255.5 km. Total number of manholes is 6,623.
  • Proposed Force Mains: 400 mm diameter, total length 1 km. 500 mm diameter, total length 6.5 km. 700 mm diameter, total length 4.4 km.
  • Total amount of Survey works: Network works are 1,237 hectares. The transmission lines works are 10.77 km.
  • Number Of BH: 57 BHS With 570 meters of Total depth
Scope of work
(Site) + (Sewage NetworksMain Sewage Trunk Lines & Force Main Lines)Sewage Network – Design + Site Works (Survey+GEO)
Sewage Network – Design + Site Works (Survey+GEO)
Key quantities
257.7 km
Designed length
1,237 ha
Survey / network area