Replacement of sewage network in the villages of AL AHSA (First Phase)
Single project / Wastewater & Sewage / Eastern Cluster

Replacement of sewage network in the villages of AL AHSA (First Phase)

Project numberP364
ClusterEastern Cluster
Program / Work orderWork Order No.4
OwnerNWC
Main consultantKUNHWA
ClassificationSewage Network – Design + Site Works (Survey+GEO)
Project detail
Overview

Project
overview.

DIA FROM 200 mm to 800 mm , Total lengthes = 109.6 km

Proposed Sewage Network: The proposed sewerage networks are connected to existing networks. Diameters range from 200 mm to 800 mm. Total length of 105.3 km. Total number of manholes is 3,098.

Proposed Force Mains: 400 mm diameter, total length 0.62 km. 500 mm diameter, total length 3.77 km.

Total amount of Survey works: Network works are 415 hectares. The transmission lines works are 16 km.

Number Of BH: 17 BHS With 170 meters of Total depth

Designed length109.6 km
Survey / network area415 ha
LocationAl-Ahsa, Eastern Province, Saudi Arabia
#
Project numberP364
Project details

Scope and technical highlights

  • DIA FROM 200 mm to 800 mm , Total lengthes = 109.6 km
  • Proposed Sewage Network: The proposed sewerage networks are connected to existing networks. Diameters range from 200 mm to 800 mm. Total length of 105.3 km. Total number of manholes is 3,098.
  • Proposed Force Mains: 400 mm diameter, total length 0.62 km. 500 mm diameter, total length 3.77 km.
  • Total amount of Survey works: Network works are 415 hectares. The transmission lines works are 16 km.
  • Number Of BH: 17 BHS With 170 meters of Total depth
Scope of work
(Site) + (Sewage NetworksMain Sewage Trunk Lines & Force Main Lines)Sewage Network – Design + Site Works (Survey+GEO)
Sewage Network – Design + Site Works (Survey+GEO)
Key quantities
109.6 km
Designed length
415 ha
Survey / network area