Single project / Pumping Stations / Wastewater & Sewage / Western Cluster
Design and implementation of the expulsion line, lifting station and its accessories to serve the Rabigh (North) areas
Project detail
Overview
Project
overview.
OUT OF SCOPE (Site works only)
Total amount of Survey works: Total works of the P.S are 7,761 m2. Force Main Works are 23.90 km.
Number Of BH: 15 BHS With 150 meters of Total depth
Total works of the P.S are 7,761 m2.
Force Main Works are 23.90 km.
15 BHS
↗
Survey / line length23.90 km⌁
Survey area7761 (m2)⌖
LocationRabigh, Saudi Arabia#
Project numberAP516Project details
Scope and technical highlights
- OUT OF SCOPE (Site works only)
- Total amount of Survey works: Total works of the P.S are 7,761 m2. Force Main Works are 23.90 km.
- Number Of BH: 15 BHS With 150 meters of Total depth
- Total works of the P.S are 7,761 m2.
- Force Main Works are 23.90 km.
- 15 BHS
- With 150 meters of Total depth
Scope of work
Site & Transmission LineSewage P.S + Force Main – Site Works (Survey+GEO)
Sewage P.S + Force Main – Site Works (Survey+GEO)
Key quantities
23.90 km
Survey / line length
7761 (m2)
Survey area