Sewage networks and treatment plant in Buqayq Governorate
Single project / Wastewater & Sewage / Eastern Cluster

Sewage networks and treatment plant in Buqayq Governorate

Project numberP360
ClusterEastern Cluster
Program / Work orderWork Order No.2
OwnerNWC
Main consultantKUNHWA
ClassificationSewage Network – Design
Project detail
Overview

Project
overview.

DIA FROM 200 mm to 1200 mm , Total lengthes = 68.5 km

Al-Zohor Pumping Station: It is implemented in one phase with a total capacity of 2800 m3/day.

Main Pumping Station: It is implemented in two phases, the first phase has a capacity of 18,400 m3/day and the second phase has a capacity of 18,400 m3/day.

Sewage Networks: Diameters range from 200 mm to 1200 mm. Total length: 54 km. Total number of manholes: 577 manholes.

Al-Zohor Force Main: Diameter 200 mm. Total length 2.7 km.

Main P.S Force Main: Diameter 500 mm. Total length 12.3 km.

Designed length68.5 km
Capacity2800 m3
LocationBuqayq / Al-Ahsa, Eastern Province, Saudi Arabia
#
Project numberP360
Project details

Scope and technical highlights

  • DIA FROM 200 mm to 1200 mm , Total lengthes = 68.5 km
  • Al-Zohor Pumping Station: It is implemented in one phase with a total capacity of 2800 m3/day.
  • Main Pumping Station: It is implemented in two phases, the first phase has a capacity of 18,400 m3/day and the second phase has a capacity of 18,400 m3/day.
  • Sewage Networks: Diameters range from 200 mm to 1200 mm. Total length: 54 km. Total number of manholes: 577 manholes.
  • Al-Zohor Force Main: Diameter 200 mm. Total length 2.7 km.
  • Main P.S Force Main: Diameter 500 mm. Total length 12.3 km.
Scope of work
Sewage Networks & Pumping StationsSewage Network – Design
Sewage Network – Design
Key quantities
68.5 km
Designed length
2800 m3
Capacity