Implementation of the water distribution network in the northwest region-1 of Rabigh city (second phase)

Water Networks – Design + Site Works (Survey+GEO) · Western Cluster · 5.50 (Hec) survey area

Implementation of the water distribution network in the Al-Samad area of Rabigh city (second phase)

Water Networks – Design + Site Works (Survey+GEO) · Western Cluster · 261.64 (Hec) survey area

Implementation of the water distribution network in the Industrial Zone 2 of Rabigh City (Phase 3)

Water Networks – Design + Site Works (Survey+GEO) · Western Cluster · 100.8 (Hec) survey area

Implementation of the water distribution network in the industrial area of Rabigh City (Phase 3)

Water Networks – Design + Site Works (Survey+GEO) · Western Cluster · 1768.6 (Hec) survey area

Implementation of the water distribution network in the western region of Rabigh city (first phase)

Water Networks – Design + Site Works (Survey+GEO) · Western Cluster · 53.96 (Hec) survey area

Implementation of the water distribution network in Al-Shulayb and the eastern part of Rabigh city (first phase)

Water Networks – Design + Site Works (Survey+GEO) · Western Cluster · 1221.10 (Hec) survey area

Implementation of a water distribution network in the Mujahideen area of Bahra City – Bahra Governorate (Contract 3B)

Water Networks – Site Works (Survey+GEO) · Western Cluster · 898.90 ha survey / network area

Implementation of the water distribution network in the Hada-2 area of the city of Bahra – Bahra Governorate (Contract 7A)

Water Networks – Site Works (Survey+GEO) · Western Cluster · 820.75 ha survey / network area

Construction of Water Distribution Network in Parts of Al Riyadh District

Water Network – Design + Site Works (Survey+GEO) · Western Cluster · 405 km designed length

Implementing distribution network in Tibah and Waqba District

Water Network – Design + Site Works (Survey+GEO) · Western Cluster · 75 km designed length

← Previous
Next →
Engineering the Future with Precision.
ECONST / Saudi Arabia

Designing futures.

Valuing the present.

Navigate
About
Expertise
Projects
Impact
Connect
Start a project ↗
econst-sa.com ↗
Location
Riyadh
Kingdom of Saudi Arabia
© 2026 ECONST
Design and Development by Hadou Design
Back to top ↑