Single project / Wastewater & Sewage / Eastern Cluster
Sewage networks and treatment plant in Buqayq Governorate
Project detail
Overview
Project
overview.
DIA FROM 200 mm to 1200 mm , Total lengthes = 68.5 km
Al-Zohor Pumping Station: It is implemented in one phase with a total capacity of 2800 m3/day.
Main Pumping Station: It is implemented in two phases, the first phase has a capacity of 18,400 m3/day and the second phase has a capacity of 18,400 m3/day.
Sewage Networks: Diameters range from 200 mm to 1200 mm. Total length: 54 km. Total number of manholes: 577 manholes.
Al-Zohor Force Main: Diameter 200 mm. Total length 2.7 km.
Main P.S Force Main: Diameter 500 mm. Total length 12.3 km.
↗
Designed length68.5 km⌁
Capacity2800 m3⌖
LocationBuqayq / Al-Ahsa, Eastern Province, Saudi Arabia#
Project numberP360Project details
Scope and technical highlights
- DIA FROM 200 mm to 1200 mm , Total lengthes = 68.5 km
- Al-Zohor Pumping Station: It is implemented in one phase with a total capacity of 2800 m3/day.
- Main Pumping Station: It is implemented in two phases, the first phase has a capacity of 18,400 m3/day and the second phase has a capacity of 18,400 m3/day.
- Sewage Networks: Diameters range from 200 mm to 1200 mm. Total length: 54 km. Total number of manholes: 577 manholes.
- Al-Zohor Force Main: Diameter 200 mm. Total length 2.7 km.
- Main P.S Force Main: Diameter 500 mm. Total length 12.3 km.
Scope of work
Sewage Networks & Pumping StationsSewage Network – Design
Sewage Network – Design
Key quantities
68.5 km
Designed length
2800 m3
Capacity