Implementing pipelines with a diameter of 300mm and above for the northern regions of Obhur Bay.F1015
Single project / Water Transmission / Western Cluster

Implementing pipelines with a diameter of 300mm and above for the northern regions of Obhur Bay.F1015

Project numberP1171
ClusterWestern Cluster
Program / Work order2
OwnerNWC
Main consultantKUNHWA
ClassificationWater Transmission Line – Design + Site Works (Survey+GEO)
Project detail
Overview

Project
overview.

DIA FROM 300 mm to 1400 mm , Total lengthes = 33 km

Proposed Transmission Line: The water transmission line consists of the following: Diameter of 300 mm with a total length of 1.62 km. Diameter of 400 mm with a total length of 7.25 km. Diameter of 600 mm with a total length of 9.15 km. Diameter of 800 mm with a total length of 2.90 km. Diameter of 1400 mm with a total length of 12.1 km.

Total amount of Survey works: Transmission Line Works are 63.23 km.

Number Of BH: 13 BHS With 142 meters of Total depth

Diameter: Length (km)

300 mm: 1.62

Designed length33 km
Survey / line length63.23 km
LocationJeddah, Saudi Arabia
#
Project numberP1171
Project details

Scope and technical highlights

  • DIA FROM 300 mm to 1400 mm , Total lengthes = 33 km
  • Proposed Transmission Line: The water transmission line consists of the following: Diameter of 300 mm with a total length of 1.62 km. Diameter of 400 mm with a total length of 7.25 km. Diameter of 600 mm with a total length of 9.15 km. Diameter of 800 mm with a total length of 2.90 km. Diameter of 1400 mm with a total length of 12.1 km.
  • Total amount of Survey works: Transmission Line Works are 63.23 km.
  • Number Of BH: 13 BHS With 142 meters of Total depth
  • Diameter: Length (km)
  • 300 mm: 1.62
  • 400 mm: 7.25
View full technical data +
  • 600 mm: 9.15
Scope of work
Transmission LineWater Transmission Line – Design + Site Works (Survey+GEO)(Survey+GEO)
Water Transmission Line – Design + Site Works (Survey+GEO)
Key quantities
33 km
Designed length
63.23 km
Survey / line length