Single project / Water Transmission / Western Cluster
Implementation of main distribution lines in the city of Ranyah
Project detail
Overview
Project
overview.
OUT OF SCOPE (Site works only)
Total amount of Survey works: Transmission Line Works are 23.60 km.
Number Of BH: 11 BHS With 55 meters of Total depth
Transmission Line Works are 24.29 km.
11 BHS
With 55 meters of Total depth
↗
Survey / line length24.29 km⌁
Survey / line length23.6 km⌖
LocationRanyah, Saudi Arabia#
Project numberP1161Project details
Scope and technical highlights
- OUT OF SCOPE (Site works only)
- Total amount of Survey works: Transmission Line Works are 23.60 km.
- Number Of BH: 11 BHS With 55 meters of Total depth
- Transmission Line Works are 24.29 km.
- 11 BHS
- With 55 meters of Total depth
Scope of work
Transmission LineWater Transmission Line – Site Works (Survey+GEO)
Water Transmission Line – Site Works (Survey+GEO)
Key quantities
24.29 km
Survey / line length
23.6 km
Survey / line length