
Single project / Water Transmission / Western Cluster
Implementation of main distribution lines in the areas from Al-Rafdah to (Al-Muzaylif) – Al-Qunfodhah Governorate
Project detail
Overview
Project
overview.
Total amount of Survey works: Transmission Line Works are 7 km.
Number Of BH: 4 BHS With 20 meters of Total depth
Transmission Line Works are 7 km.
4 BHS
With 20 meters of Total depth
↗
Survey / line length7 km⌁
Boreholes4 BH⌖
LocationAl-Qunfudhah, Saudi Arabia#
Project numberAP532Project details
Scope and technical highlights
- Total amount of Survey works: Transmission Line Works are 7 km.
- Number Of BH: 4 BHS With 20 meters of Total depth
- Transmission Line Works are 7 km.
- 4 BHS
- With 20 meters of Total depth
Scope of work
Transmission LineWater Transmission Line – Site Works (Survey+GEO)
Water Transmission Line – Site Works (Survey+GEO)
Key quantities
7 km
Survey / line length
4 BH
Boreholes
Project gallery
Project imagery.
1 image



