Implementation of main distribution lines in the areas from Al-Rafdah to (Al-Muzaylif) – Al-Qunfodhah Governorate
Single project / Water Transmission / Western Cluster

Implementation of main distribution lines in the areas from Al-Rafdah to (Al-Muzaylif) – Al-Qunfodhah Governorate

Project numberAP532
ClusterWestern Cluster
Program / Work orderGroup.12 Qunfodah
OwnerNWC
Main consultantKUNHWA
ClassificationWater Transmission Line – Site Works (Survey+GEO)
Project detail
Overview

Project
overview.

Total amount of Survey works: Transmission Line Works are 7 km.

Number Of BH: 4 BHS With 20 meters of Total depth

Transmission Line Works are 7 km.

4 BHS

With 20 meters of Total depth

Survey / line length7 km
Boreholes4 BH
LocationAl-Qunfudhah, Saudi Arabia
#
Project numberAP532
Project details

Scope and technical highlights

  • Total amount of Survey works: Transmission Line Works are 7 km.
  • Number Of BH: 4 BHS With 20 meters of Total depth
  • Transmission Line Works are 7 km.
  • 4 BHS
  • With 20 meters of Total depth
Scope of work
Transmission LineWater Transmission Line – Site Works (Survey+GEO)
Water Transmission Line – Site Works (Survey+GEO)
Key quantities
7 km
Survey / line length
4 BH
Boreholes