Implementation of the main distribution lines, including pumping works up to the demonstration tank – Al Qunfodhah Governorate
Single project / Water Transmission / Western Cluster

Implementation of the main distribution lines, including pumping works up to the demonstration tank – Al Qunfodhah Governorate

Project numberAP531
ClusterWestern Cluster
Program / Work orderGroup.12 Qunfodah
OwnerNWC
Main consultantKUNHWA
ClassificationWater Transmission Line – Site Works (Survey+GEO)
Project detail
Overview

Project
overview.

Total amount of Survey works: Transmission Line Works are 50 km.

Number Of BH: 26 BHS With 130 meters of Total depth

Transmission Line Works are 50 km.

26 BHS

With 130 meters of Total depth

Survey / line length50 km
Boreholes26 BH
LocationAl-Qunfudhah, Saudi Arabia
#
Project numberAP531
Project details

Scope and technical highlights

  • Total amount of Survey works: Transmission Line Works are 50 km.
  • Number Of BH: 26 BHS With 130 meters of Total depth
  • Transmission Line Works are 50 km.
  • 26 BHS
  • With 130 meters of Total depth
Scope of work
Transmission LineWater Transmission Line – Site Works (Survey+GEO)
Water Transmission Line – Site Works (Survey+GEO)
Key quantities
50 km
Survey / line length
26 BH
Boreholes