Implementing the expansion of the water distribution system (the city’s gateway tank and the upper tamks, the main distribution lines) package 1
Single project / Water Transmission / Western Cluster

Implementing the expansion of the water distribution system (the city’s gateway tank and the upper tamks, the main distribution lines) package 1

Project numberAP479
ClusterWestern Cluster
Program / Work orderGroup No. 4 - Rabigh
OwnerNWC
Main consultantKUNHWA
ClassificationWater Transmission Line – Design + Site Works (Survey+GEO)
Project detail
Overview

Project
overview.

DIA FROM 300 mm to 1000 mm , Total lengthes = 47.7 km

Proposed water transmission line: The Proposed water transmission line diameters range from 300 mm to 1000 mm. With a total length of 47.70 km.

Total amount of Survey works: Transmission Line Works are 47.45 km.

Number Of BH: 4 BHS With 170 meters of Total depth

AP471: Networks

AP472: Networks

Designed length47.7 km
Survey / line length47.45 km
LocationRabigh, Saudi Arabia
#
Project numberAP479
Project details

Scope and technical highlights

  • DIA FROM 300 mm to 1000 mm , Total lengthes = 47.7 km
  • Proposed water transmission line: The Proposed water transmission line diameters range from 300 mm to 1000 mm. With a total length of 47.70 km.
  • Total amount of Survey works: Transmission Line Works are 47.45 km.
  • Number Of BH: 4 BHS With 170 meters of Total depth
  • AP471: Networks
  • AP472: Networks
  • AP473: Networks
View full technical data +
  • AP474: Networks
Scope of work
Transmission LinesWater Transmission Line – Design + Site Works (Survey+GEO)(Survey+GEO)
Water Transmission Line – Design + Site Works (Survey+GEO)
Key quantities
47.7 km
Designed length
47.45 km
Survey / line length