Single project / Water Transmission / Western Cluster
Implementing the expansion of the water distribution system (the city’s gateway tank and the upper tamks, the main distribution lines) package 1
Project detail
Overview
Project
overview.
DIA FROM 300 mm to 1000 mm , Total lengthes = 47.7 km
Proposed water transmission line: The Proposed water transmission line diameters range from 300 mm to 1000 mm. With a total length of 47.70 km.
Total amount of Survey works: Transmission Line Works are 47.45 km.
Number Of BH: 4 BHS With 170 meters of Total depth
AP471: Networks
AP472: Networks
↗
Designed length47.7 km⌁
Survey / line length47.45 km⌖
LocationRabigh, Saudi Arabia#
Project numberAP479Project details
Scope and technical highlights
- DIA FROM 300 mm to 1000 mm , Total lengthes = 47.7 km
- Proposed water transmission line: The Proposed water transmission line diameters range from 300 mm to 1000 mm. With a total length of 47.70 km.
- Total amount of Survey works: Transmission Line Works are 47.45 km.
- Number Of BH: 4 BHS With 170 meters of Total depth
- AP471: Networks
- AP472: Networks
- AP473: Networks
View full technical data +
- AP474: Networks
Scope of work
Transmission LinesWater Transmission Line – Design + Site Works (Survey+GEO)(Survey+GEO)
Water Transmission Line – Design + Site Works (Survey+GEO)
Key quantities
47.7 km
Designed length
47.45 km
Survey / line length