Implementation of water distribution lines from the proposed operational reservoir in Bahra City to the southeastern city gate reservoir in Jeddah City
Single project / Water Transmission / Western Cluster

Implementation of water distribution lines from the proposed operational reservoir in Bahra City to the southeastern city gate reservoir in Jeddah City

Project numberAP458
ClusterWestern Cluster
Program / Work orderGroup.07 Bahra
OwnerNWC
Main consultantKUNHWA
ClassificationWater Transmission Line – Site Works (Survey+GEO)
Project detail
Overview

Project
overview.

OUT OF SCOPE (Site works only)

Total amount of Survey works: Transmission Line Works are 18.66 km. Total area for the operational tank site is 65,384 m2

Number Of BH: 17 BHS With 170 meters of Total depth

Transmission Line Works are 2.96 km.

17 BHS

With 170 meters of Total depth

Site / survey area65,384 m2
Survey / line length2.96 km
LocationBahra, Saudi Arabia
#
Project numberAP458
Project details

Scope and technical highlights

  • OUT OF SCOPE (Site works only)
  • Total amount of Survey works: Transmission Line Works are 18.66 km. Total area for the operational tank site is 65,384 m2
  • Number Of BH: 17 BHS With 170 meters of Total depth
  • Transmission Line Works are 2.96 km.
  • 17 BHS
  • With 170 meters of Total depth
Scope of work
Transmission LineWater Transmission Line – Site Works (Survey+GEO)
Water Transmission Line – Site Works (Survey+GEO)
Key quantities
65,384 m2
Site / survey area
2.96 km
Survey / line length