Single project / Water Transmission / Western Cluster
Construction of Water Transmission main from new Faisalyah PS to Faisalyah South loop
Project detail
Overview
Project
overview.
DIA FROM 800 mm to 1600 mm , Total lengthes = 2.86 km
Proposed Transmission Line: The water transmission line consists of the following: Diameter of 800 mm with a total length of 1.10 km. Diameter of 1200 mm with a total length of 0.38 km. Diameter of 1400 mm with a total length of 0.62 km. Diameter of 1600 mm with a total length of 0.77 km.
Total amount of Survey works: Transmission Line Works are 2.05 km.
Number Of BH: 2 BHS With 22 meters of Total depth
Diameter: Length (km)
800 mm: 1.10
↗
Designed length2.86 km⌁
Survey / line length2.41 km⌖
LocationJeddah, Saudi Arabia#
Project numberAP403Project details
Scope and technical highlights
- DIA FROM 800 mm to 1600 mm , Total lengthes = 2.86 km
- Proposed Transmission Line: The water transmission line consists of the following: Diameter of 800 mm with a total length of 1.10 km. Diameter of 1200 mm with a total length of 0.38 km. Diameter of 1400 mm with a total length of 0.62 km. Diameter of 1600 mm with a total length of 0.77 km.
- Total amount of Survey works: Transmission Line Works are 2.05 km.
- Number Of BH: 2 BHS With 22 meters of Total depth
- Diameter: Length (km)
- 800 mm: 1.10
- 1200 mm: 0.38
View full technical data +
- 1400 mm: 0.62
Scope of work
Transmission LineWater Transmission Line – Design + Site Works (Survey+GEO)(Survey+GEO)
Water Transmission Line – Design + Site Works (Survey+GEO)
Key quantities
2.86 km
Designed length
2.41 km
Survey / line length