Construction of Water Transmission main from new Faisalyah PS to Faisalyah South loop
Single project / Water Transmission / Western Cluster

Construction of Water Transmission main from new Faisalyah PS to Faisalyah South loop

Project numberAP403
ClusterWestern Cluster
Program / Work order3
OwnerNWC
Main consultantKUNHWA
ClassificationWater Transmission Line – Design + Site Works (Survey+GEO)
Project detail
Overview

Project
overview.

DIA FROM 800 mm to 1600 mm , Total lengthes = 2.86 km

Proposed Transmission Line: The water transmission line consists of the following: Diameter of 800 mm with a total length of 1.10 km. Diameter of 1200 mm with a total length of 0.38 km. Diameter of 1400 mm with a total length of 0.62 km. Diameter of 1600 mm with a total length of 0.77 km.

Total amount of Survey works: Transmission Line Works are 2.05 km.

Number Of BH: 2 BHS With 22 meters of Total depth

Diameter: Length (km)

800 mm: 1.10

Designed length2.86 km
Survey / line length2.41 km
LocationJeddah, Saudi Arabia
#
Project numberAP403
Project details

Scope and technical highlights

  • DIA FROM 800 mm to 1600 mm , Total lengthes = 2.86 km
  • Proposed Transmission Line: The water transmission line consists of the following: Diameter of 800 mm with a total length of 1.10 km. Diameter of 1200 mm with a total length of 0.38 km. Diameter of 1400 mm with a total length of 0.62 km. Diameter of 1600 mm with a total length of 0.77 km.
  • Total amount of Survey works: Transmission Line Works are 2.05 km.
  • Number Of BH: 2 BHS With 22 meters of Total depth
  • Diameter: Length (km)
  • 800 mm: 1.10
  • 1200 mm: 0.38
View full technical data +
  • 1400 mm: 0.62
Scope of work
Transmission LineWater Transmission Line – Design + Site Works (Survey+GEO)(Survey+GEO)
Water Transmission Line – Design + Site Works (Survey+GEO)
Key quantities
2.86 km
Designed length
2.41 km
Survey / line length