Completion of part of the sewage project No. 9 in Masarra 2 district
Single project / Wastewater & Sewage / Western Cluster

Completion of part of the sewage project No. 9 in Masarra 2 district

Project numberAP1275
ClusterWestern Cluster
Program / Work orderWestern Cluster - 1
OwnerNWC
Main consultantIDOM
ClassificationSewage Network - Design
Project detail
Overview

Project
overview.

DIA FROM 200 mm to 400 mm , Total lengthes = 5.70 km

Proposed Sewage Network: The diameters of the proposed sewage networks range from 200 mm to 400 mm, with a total length of 5 km.

Total amount of Survey works: 367 Hectare

Number Of BH: 6 BHS With 60 meters of Total depth

Designed length5.70 km
Boreholes6 BH
StatusApproved
LocationWestern Region, Saudi Arabia
Project details

Scope and technical highlights

  • DIA FROM 200 mm to 400 mm , Total lengthes = 5.70 km
  • Proposed Sewage Network: The diameters of the proposed sewage networks range from 200 mm to 400 mm, with a total length of 5 km.
  • Total amount of Survey works: 367 Hectare
  • Number Of BH: 6 BHS With 60 meters of Total depth
Scope of work
Sewage NetworksSewage Network - Design
Sewage Network - Design
Key quantities
5.70 km
Designed length
6 BH
Boreholes