Construction of Water Transmission lines Extensions from P1 to Faisalyah North Zone
Single project / Water Transmission / Western Cluster

Construction of Water Transmission lines Extensions from P1 to Faisalyah North Zone

Project numberAD45-2
ClusterWestern Cluster
Program / Work order3
OwnerNWC
Main consultantKUNHWA
ClassificationWater Transmission Line – Design + Site Works (Survey+GEO)
Project detail
Overview

Project
overview.

DIA FROM 800 mm to 1200 mm , Total lengthes = 7.27 km

Proposed Transmission Line: The water transmission line consists of the following: Diameter of 800 mm with a total length of 0.17 km. Diameter of 1200 mm with a total length of 2.90 km. Diameter of 1400 mm with a total length of 4.20 km.

Total amount of Survey works: Transmission Line Works are 6.80 km.

Number Of BH: 4 BHS With 44 meters of Total depth

Diameter: Length (km)

800 mm: 0.17

Designed length7.27 km
Survey / line length6.86 km
LocationJeddah, Saudi Arabia
#
Project numberAD45-2
Project details

Scope and technical highlights

  • DIA FROM 800 mm to 1200 mm , Total lengthes = 7.27 km
  • Proposed Transmission Line: The water transmission line consists of the following: Diameter of 800 mm with a total length of 0.17 km. Diameter of 1200 mm with a total length of 2.90 km. Diameter of 1400 mm with a total length of 4.20 km.
  • Total amount of Survey works: Transmission Line Works are 6.80 km.
  • Number Of BH: 4 BHS With 44 meters of Total depth
  • Diameter: Length (km)
  • 800 mm: 0.17
  • 1000 mm: 2.90
View full technical data +
  • 1200 mm: 4.20
Scope of work
Transmission LineWater Transmission Line – Design + Site Works (Survey+GEO)(Survey+GEO)
Water Transmission Line – Design + Site Works (Survey+GEO)
Key quantities
7.27 km
Designed length
6.86 km
Survey / line length