Design and Construction of Water Transmission Line from CP2 Line to P1 Line to serve Areas West of Airport
Single project / Water Transmission / Western Cluster

Design and Construction of Water Transmission Line from CP2 Line to P1 Line to serve Areas West of Airport

Project numberAD44
ClusterWestern Cluster
Program / Work order4
OwnerNWC
Main consultantKUNHWA
ClassificationWater Transmission Line – Design + Site Works (Survey+GEO)
Project detail
Overview

Project
overview.

DIA FROM 300 mm to 1600 mm , Total lengthes = 18.3 km

Proposed Transmission Line: The water transmission line consists of the following: Diameter of 400+500 mm with a total length of 0.85 km. Diameter of 600 mm with a total length of 4.03 km. Diameter of 800 mm with a total length of 0.52 km. Diameter of 1600 mm with a total length of 11.4 km.

Total amount of Survey works: Transmission Line Works are 2.05 km.

Number Of BH: 2 BHS With 22 meters of Total depth

Diameter: Length (km)

400 + 500 mm: 0.85

Designed length18.3 km
Survey / line length17.56 km
LocationWestern Region, Saudi Arabia
#
Project numberAD44
Project details

Scope and technical highlights

  • DIA FROM 300 mm to 1600 mm , Total lengthes = 18.3 km
  • Proposed Transmission Line: The water transmission line consists of the following: Diameter of 400+500 mm with a total length of 0.85 km. Diameter of 600 mm with a total length of 4.03 km. Diameter of 800 mm with a total length of 0.52 km. Diameter of 1600 mm with a total length of 11.4 km.
  • Total amount of Survey works: Transmission Line Works are 2.05 km.
  • Number Of BH: 2 BHS With 22 meters of Total depth
  • Diameter: Length (km)
  • 400 + 500 mm: 0.85
  • 600 mm: 4.03
View full technical data +
  • 800 mm: 0.52
Scope of work
Transmission LineWater Transmission Line – Design + Site Works (Survey+GEO)(Survey+GEO)
Water Transmission Line – Design + Site Works (Survey+GEO)
Key quantities
18.3 km
Designed length
17.56 km
Survey / line length