Construction of Pipelines of Diameters of 300mm and Above on Asfan Road and within Miscellaneous districts east of Al Harameen Expressway and north east of KAIA

Project Number AP405 Program 2 Owner NWC Main Consultant KUNHWA Project classification Water Transmission Line – Design + Site Works (Survey+GEO) Project Contents Proposed Transmission Line Diameter of 600mm with total length of 4.65km. Diameter of 800mm with total length of 7.40km. Diameter of 1200mm with total length of 4.95km. Survey Works Transmission Line Works […]

Implementing water distribution network in Salhia District

AP651 Project Number 1 Program NWC Owner KUNHWA Main Consultant Water NetworkDesign + Site Works (Survey+GEO) Project classification Project Contents Proposed Water Network The proposed water network diameters range from110 mm to 300 mm.With a total length of 83 km. Connection points on existing water networks The proposed networks are connected to the existingand surrounding […]

Implementing water distribution network in Al Kawthar District

Project Number AP657 Program 1 Owner NWC Main Consultant KUNHWA Project classification Water NetworkDesign + Site Works (Survey+GEO) Project Contents Proposed Water Network The proposed water network diameters range from110 mm to 400 mm.With a total length of 53 km. Connection points on existing water networks The proposed networks are connected to the existingand surrounding […]

Implementing distribution network in Tibah and Waqba District

Project Number AP1281 Program 1 Owner NWC Main Consultant KUNHWA Project classification Water NetworkDesign + Site Works (Survey+GEO) Project Contents Proposed Water Network The proposed water network diameters range from110 mm to 315 mm.With a total length of 75 km. Connection points onexisting water networks The proposed networks are connected to the existingand surrounding water […]