Implementation of the upgrade of the new high operational tank in Rabigh – Rabigh Governorate

Project Number AP68 Program Group.02 Rabigh Owner NWC Main Consultant KUNHWA Project classification Operational Tank – Site Works (Survey-GEO) Project Contents Total Amount of Survey Works Total works of the P.S are 18,500 m2. Number of BH 1 BHs with 40 meters of total depth
Implementation of water distribution networks fed from the existing ground tank in Al-Kamil-1 City

Project Number AP129 Program Group.01 AlKamel Owner NWC Main Consultant KUNHWA Project classification Water Networks – Site Works (Survey-GEO) Project Contents Total Amount of Survey Works Network works are 55.65 hectares. Number of BH 1.1 BHs with 110 meters of total depth
Implementation of the main distribution lines in Al-Kamil City, Al-Kamil Governorate

Project Number AP49 Program Group.01 AlKamel Owner NWC Main Consultant KUNHWA Project classification Water Transmission Line – Site Works (Survey-GEO) Project Contents Total Amount of Survey Works Transmission Line Works are 28.9 km. Number of BH 4 BHs with 40 meters of total depth
Design and Construction of Water Transmission Line from CP2 Line to P1 to serve areas west of Airport

Project Number AD44 Program 4 Owner NWC Main Consultant KUNHWA Project classification (Survey-GEO) Line – Design + Site Works Project Contents Proposed Transmission Line The water transmission line consists of the following: Diameter of 400-500 mm with a total length of 0.85 km. Dia. of 600 mm with a total length of 4.03 km. Diameter […]
Construction of Pipelines of Diameters 400mm South and South East Al Faisalyah Complex

Project Number P1165 Program 4 Owner NWC Main Consultant KUNHWA Project classification Water Transmission Line – Design + Site Works (Survey-GEO) Project Contents Proposed Transmission Line Diameter of 400 mm with a total length of 1.80 km: Diameter of 600 mm with a total length of 7.40 km. Diameter of 1000 mm with a total […]
Construction of Pipelines of Diameters 400mm South and South East Al Faisalyah Districts Complex

Project Number P7 Program 4 Owner NWC Main Consultant KUNHWA Project classification (Survey-GEO) Transmission Line – Design + Site Works Project Contents Proposed Transmission Line The water transmission line consists of the following: Diameter of 600 mm with a total length of 4.08 km. Diameter of 1000 mm with a total length of 11.39 km. […]
Construction of Water Transmission Main Interconnections from P1, GRC (Part 1)

Project Number AD45-1 Program AD45-1 Owner NWC Main Consultant KUNHWA Project classification Water Transmission Line – Design + Site Works (Survey-GEO) Project Contents Proposed Transmission Line The water transmission line consists of the following: Diameter of 1400 mm with a total length of 6.30 km. Diameter of 1800 mm with a total length of 1.15 […]
Construction of Water Transmission Lines Extensions from P1 to Faisalyah North Zone

Project Number AD45-2 Program 3 Owner NWC Main Consultant KUNHWA Project classification Water Transmission Line – Design + Site Works (Survey-GEO) Project Contents Proposed Transmission Line The water transmission line consists of the following: Diameter of 800 mm with a total length of 0.17 km: Diameter of 1200 mm with a total length of 2.90 […]
Construction of Water Transmission Main from Faisalya PS to Faisalya South Loop

Project Number AP403 Program 3 Owner NWC Main Consultant KUNHWA Project classification Water Transmission Line – Design + Site Works (Survey-GEO) Project Contents Proposed Transmission Line The water transmission line consists of the following: Diameter of 1200 mm with a total length of 1.08 km. Diameter of 1600 mm with a total length of 0.72 […]
Construction of Water Distribution Network in Parts of Al Ryadh District

Project Number AP404 Program 1 Owner NWC Main Consultant KUNHWA Project classification Water Network- Design + Site Works (Survey-GEO) Project Contents Proposed Water Networks The proposed water network diameters range from 110mm to 600mm. With a total length of 405km. Existing Water Points on Connection The proposed networks are connected to the existing and surrounding […]