| Project Number | AP68 |
| Program | Group.02 Rabigh |
| Owner | NWC |
| Main Consultant | KUNHWA |
| Project classification | Operational Tank – Site Works (Survey-GEO) |
Project Contents
| Total Amount of Survey Works | Total works of the P.S are 18,500 m2. |
| Number of BH | 1 BHs with 40 meters of total depth |